Capacity Expansion Planning for Sheet Metal Production

When lead time, overtime, outsourcing cost, or unstable quality keeps increasing, identify the real production bottleneck before investing in additional equipment or capacity upgrades.

For

Use the following steps to identify your capacity bottleneck before choosing an upgrade direction.

STEP 01

Diagnose Capacity Bottlenecks Before Expansion Planning

Lead Time Pressure

Overtime Dependency

Outsourcing Increase

Scheduling Bottleneck

Quality Fluctuation

High Machine Utilization

STEP 03

Balance Complete Integrated Production Flow

Cutting

Review material grade, thickness range, laser power, table size, nesting efficiency, piercing stability, and cutting takt time.

Bending

Check tonnage margin, bending length, V-die opening, tooling setup, backgauge accuracy, angle control, and batch changeover time.

Handling

Assess sheet loading, finished-part unloading, part sorting, buffer area, lifting method, and work-in-process waiting time.

Assembly

Manufacture, assemble, and inspect the equipment according to confirmed configuration and factory quality-control procedures.

Inspection

Align bend angle inspection, cut profile checks, dimensional measurement, quality records, and sampling frequency with higher output.

Delivery

Coordinate finished-part staging, protective packing, shipment schedule, and customer delivery commitments.

Trusted Global Component Brands

We use internationally recognized components to ensure stable performance, long service life, and reliable operation.

PARTNER

Contact PREF Group

Need a Quick Answer

We highly recommend contacting us via WhatsApp, our engineers are ready to assist you in realtime

Send Your Inquiry: